BLUE LAKE INTERCEPTOR REHABILITATION

BLUE LAKE INTERCEPTOR REHABILITATION

IN Highway Heavy, Restoration
Project:
BLUE LAKE INTERCEPTOR REHABILITATION
Location:
Shakopee, MN
Owner/Agency:
Metropolitan Council
Contract Amount:
$719,938.72
About Project

The Blue Lake Interceptor Rehabilitation project was performed at two locations in Shakopee, Minnesota. One site required the removal and replacement of 1,400 lineal feet of open cut 72” pipe; the second site required the rehabilitation of 3,500 lineal feet of 72” pipe using the cured-in-place pipe (CIPP) lining method.

Standard Contracting provided numerous services for this project, including erosion control, bituminous trail restoration, bituminous pavement patching, mill and overlay and landscape restoration.

SCOPE OF WORK:
• Erosion Control
• Seeding & Landscape Restoration
• Bituminous Trail Restoration
• Bituminous Pavement Patching